title: Slope Stability of Embankments on Clay - PLAXIS
description: PLAXIS Finite Element Analysis - Solving Complex Geotechnical Analysis Challenges
image: https://blog.virtuosity.com/hs-fs/hubfs/Excess%20pore%20pressures%20after%20construction%20on%20undrained%20subsoil.png?width=780&name=Excess%20pore%20pressures%20after%20construction%20on%20undrained%20subsoil.png
---

[Skip to content](https://virtuos4u.com/blog/slope-stability-of-embankments-on-clay-plaxis#main-content)

English

- [Deutsch – Deutschland](https://virtuos4u.com/de-de/blog/hangstabilit%C3%A4t-von-b%C3%B6schungen-auf-lehm-plaxis)
- [English](https://virtuos4u.com/blog/slope-stability-of-embankments-on-clay-plaxis)

 English

This is a search field with an auto-suggest feature attached.

- There are no suggestions because the search field is empty.

[![virtuos4u_2_348 20 cm](https://virtuos4u.com/hs-fs/hubfs/virtuos4u_2_348%2020%20cm.png?width=200&height=125&name=virtuos4u_2_348%2020%20cm.png "virtuos4u_2_348 20 cm")](https://virtuos4u.com?hsLang=en)

- [Blog](https://virtuos4u.com/blog)

- [MEETING](https://virtuos4u.com/meetings/stephan-decker/termin-mit-stephan?hsLang=en)
- [E-MAIL](mailto:s.decker@virtuos4u.com)
- Search Search
  
  Search

- [Geotechnical](https://virtuos4u.com/blog/tag/geotechnical)

# Slope Stability of Embankments on Clay - PLAXIS

![Complex Tunneling Challenge - solved with PLAXIS 3D](https://blog.virtuosity.com/hs-fs/hubfs/Excess%20pore%20pressures%20after%20construction%20on%20undrained%20subsoil.png?width=780&name=Excess%20pore%20pressures%20after%20construction%20on%20undrained%20subsoil.png)

- August 4, 2023

![Jessica Nentwich](https://app.hubspot.com/settings/avatar/d41d8cd98f00b204e9800998ecf8427e)

[Jessica Nentwich](https://virtuos4u.com/blog/author/jessica-nentwich)

 

## The Challenge in Slope Stability Analysis for Embankments on Clay

The construction of an embankment on clay can generate excess pore pressure in the clay, causing slope stability problems in the short term. For this reason, it’s important to evaluate the Factor of Safety while considering the clay behavior both drained (long term) and undrained (short term). These different Factors of Safety can be easily determined using finite element software to perform a strength reduction safety analysis.

## Slope Stability Analysis Made Simple

For a finite element analysis of an embankment on clay, the required inputs are as follows:

1. Soil stratigraphy
2. Embankment geometry
3. Geotechnical parameters of the materials involved

These parameters vary according to the constitutive model adopted for each material. Here are some example models:

- Young's Modulus and Poisson Ratio for stiffness
- Cohesion for strength, unit weight, etc.

The workflow to perform your finite element analysis would follow these steps:

1. Define the soil stratigraphy
2. Draw the structures related to the geotechnical project
3. Create the Finite Element mesh
4. Define the flow conditions
5. Set the staged construction phases

After these steps are completed, the geotechnical analysis can be performed. Each construction phase is calculated separately, in sequence.

 

## Breakdown: Example Analysis

As an example, we’ll consider a 13 ft (4 m) high embankment.

- The slopes are 1V:2H and 1V:3H constructed on a clay foundation
- The embankment crest width is 7 ft (2 m)
- The groundwater level is at the surface
- Two different sets of parameters are defined for the clay foundation: one for the drained behavior and the other for the undrained behavior

![Geotechnical model of the slope stability example](https://blog.virtuosity.com/hs-fs/hubfs/Geotechnical%20model%20of%20the%20slope%20stability%20example.png?width=780&name=Geotechnical%20model%20of%20the%20slope%20stability%20example.png)

*Geotechnical model of the slope stability example*

 

To analyze the drained and the undrained stability of the problem, different calculation phases are set:

Initial phase: Generation of initial stresses at the site, prior to the construction of the embankment. Due to the horizontal surface, the K0 procedure can be used to do so.

First phase: Plastic calculation of the construction of the embankment on the drained clay.

Second phase: Plastic calculation of the embankment on undrained clay.

For the strength reduction safety analysis, two new phases are created: the third phase, starting from the first phase, for the drained safety analysis, and the fourth phase, starting from the second phase, for the undrained safety analysis.

The output of the finite element analysis of the phases above is the strain, displacements, stresses, pore pressures, and Factor of Safety for both the drained and undrained foundation. The failure mechanism can also be seen for both cases.

For example, the displacements indicate that the embankment settles everywhere in the case of the drained foundation, while in the undrained case the foundation heaves near the toes. This makes perfect sense: it cannot be volume change in the undrained foundation. Hence, if the subsoil settles in the middle due to the weight of the embankment it must heave somewhere else, typically just next to the embankment.

![Deformed mesh after drained and undrained plastic calculation](https://blog.virtuosity.com/hs-fs/hubfs/Deformed%20mesh%20after%20drained%20and%20undrained%20plastic%20calculation.png?width=780&name=Deformed%20mesh%20after%20drained%20and%20undrained%20plastic%20calculation.png)

*Deformed mesh after drained (top) and undrained (bottom) plastic calculation*

 

Regarding the generation of excess pore pressures, we see that no excess pore pressure is generated in the drained condition, as expected. For the undrained condition, the location, intensity, and principal directions of the excess pore pressure can be verified. For example, we can see that the highest values of pore pressure occur directly underneath the embankment.

![Excess pore pressures after construction on undrained subsoil](https://blog.virtuosity.com/hs-fs/hubfs/Excess%20pore%20pressures%20after%20construction%20on%20undrained%20subsoil.png?width=780&name=Excess%20pore%20pressures%20after%20construction%20on%20undrained%20subsoil.png)

*Excess pore pressures after construction on undrained subsoil*

 

The obtained Factors of Safety are different for the drained and undrained analysis, showing the effect of the excess pore pressure in the foundation. The maximum displacements presented in the safety analysis have no physical meaning, as they depend on the number of steps. More loads steps would mean the calculation would push further into failure, thus generating larger displacement – while, in reality, a failing embankment would re-establish a new equilibrium with limited deformations. However, the incremental displacements in the final step of the calculation are very useful as they give an indication of the likely failure mechanism.

![Failure mechanism after drained and undrained analysis](https://blog.virtuosity.com/hs-fs/hubfs/Failure%20mechanism%20after%20drained%20and%20undrained%20analysis.png?width=780&name=Failure%20mechanism%20after%20drained%20and%20undrained%20analysis.png)

*Failure mechanism after drained (top) and undrained (bottom) analysis*

 

The failure mechanisms indicated by the safety analysis show that with drained foundation, the critical slip surface is located completely within the embankment. On the other hand, with undrained foundation, the critical slip surface also passes through the foundation.

![Evaluation of the Factor of Safety drained and undrained](https://blog.virtuosity.com/hs-fs/hubfs/Evaluation%20of%20the%20Factor%20of%20Safety%20drained%20and%20undrained.png?width=780&name=Evaluation%20of%20the%20Factor%20of%20Safety%20drained%20and%20undrained.png)

*Evaluation of the Factor of Safety, drained (top) and undrained (bottom)*

 

This example shows how finite element analysis is a powerful tool to evaluate the generation of excess pore pressures and Factor of Safety, providing important information to assess the compliance with safety standards of geotechnical projects.

 

Text by Felipe de Nadai, Bentley Systems, Aug 15th, 2022

 

 Blog Post

## Interested in more PRAXIS with PLAXIS?

[![Complex Tunneling Challenge - solved with PLAXIS 3D](https://virtuos4u.com/hubfs/WSP_PLAXIS_Design-flow-chart-showing-of-the-automised-analysis.jpeg)](https://virtuos4u.com/blog/how-wsp-automated-the-analysis-of-160-ground-improvement-designs-with-plaxis?hsLang=en)

[Geotechnical](https://virtuos4u.com/blog/tag/geotechnical)

### [How WSP automated the analysis of 160 ground improvement designs with PLAXIS](https://virtuos4u.com/blog/how-wsp-automated-the-analysis-of-160-ground-improvement-designs-with-plaxis?hsLang=en)

 August 23, 2023

[READ](https://virtuos4u.com/blog/how-wsp-automated-the-analysis-of-160-ground-improvement-designs-with-plaxis?hsLang=en)

[![Complex Tunneling Challenge - solved with PLAXIS 3D](https://virtuos4u.com/hubfs/2.gif)](https://virtuos4u.com/blog/finite-element-analysis-plaxis?hsLang=en)

[Geotechnical](https://virtuos4u.com/blog/tag/geotechnical)

### [Finite Element Analysis - PLAXIS](https://virtuos4u.com/blog/finite-element-analysis-plaxis?hsLang=en)

 August 4, 2023

[READ](https://virtuos4u.com/blog/finite-element-analysis-plaxis?hsLang=en)

[![On the Importance of an Appropriate Soil Model - PLAXIS](https://virtuos4u.com/hubfs/On%20the%20Importance%20of%20an%20Appropriate%20Soil%20Model%20PLAXIS%203.webp)](https://virtuos4u.com/blog/plaxis-finite-element-analysis-used-in-landslide-remediation-project-0?hsLang=en)

[Geotechnical](https://virtuos4u.com/blog/tag/geotechnical)

### [On the Importance of an Appropriate Soil Model - PLAXIS](https://virtuos4u.com/blog/plaxis-finite-element-analysis-used-in-landslide-remediation-project-0?hsLang=en)

 June 28, 2023

[READ](https://virtuos4u.com/blog/plaxis-finite-element-analysis-used-in-landslide-remediation-project-0?hsLang=en)

[MORE ARTICLES](https://virtuos4u.com/blog)

 4 Your Success in Infrastructure Projects

### Need more software information?

[TO OVERVIEW](https://virtuos4u.com/de/infrastructure-software?hsLang=en)

 Subscribe for

### Our Blog

Would you please send us your e mail address?

[![virtuos4u_2_348 20 cm](https://virtuos4u.com/hs-fs/hubfs/virtuos4u_2_348%2020%20cm.png?width=201&height=126&name=virtuos4u_2_348%2020%20cm.png "virtuos4u_2_348 20 cm")](https://virtuos4u.com?hsLang=en)

![Channel Partner w on b](https://virtuos4u.com/hs-fs/hubfs/Channel%20Partner%20w%20on%20b.jpg?width=230&height=93&name=Channel%20Partner%20w%20on%20b.jpg "Channel Partner w on b")

### Pages

- [Home](https://virtuos4u.com)
- [Virtuosity - Bentley's E-Shop](https://virtuos4u.com/virtuosity)
- [Bentley's Infrastructure Software](https://virtuos4u.com/infrastructure-software)
- [Service for Bentley Partners](https://virtuos4u.com/de/service-for-bentley-partners)
- [Consulting/Coaching for Marketing & Sales](https://virtuos4u.com/b2b-marketing-and-sales-consulting)
- [About us](https://virtuos4u.com/about-stephan-decker-and-jessica-nentwich)

### Contact

VIRTUOS4U GmbH

+49 171 1010712

+44 742 9841010

[Terms & Conditions](https://virtuos4u.com/hubfs/AGB%20VIRTUOS4U%20GmbH_en_1-2023%20.pdf?hsLang=en)

- [Legal Notice](https://virtuos4u.com/legal-notice)
- [Privacy Policy](https://virtuos4u.com/privacy-policy)

 Follow us [Follow us on LinkedIn](https://www.linkedin.com/company/virtuos4u/) [Follow us on Facebook](https://whatsapp.com/channel/0029Va8a3Dy2Jl8LYFVxtd1M) [Follow us on Facebook](https://www.facebook.com/profile.php?id=100089723452874) [Follow us on Twitter](https://www.instagram.com/virtuos4u/) [Follow us on Facebook](https://www.youtube.com/@bentleysystems)

© 2026 VIRTUOS4U GmbH

High-performance software for infrastructure projects of any size - We are D-A-CH partner of Bentley Systems and take care of everything around Bentley for you. Visit our e-Shop Virtuosity!

![](https://px.ads.linkedin.com/collect/?pid=4970746&fmt=gif)

```json
{
  "@context" : "https://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Jessica Nentwich",
    "url" : "https://virtuos4u.com/blog/author/jessica-nentwich"
  },
  "dateModified" : "2023-08-04T14:50:17.559Z",
  "datePublished" : "2023-08-04T14:50:17.000Z",
  "headline" : "Slope Stability of Embankments on Clay - PLAXIS",
  "image" : [ "https://blog.virtuosity.com/hs-fs/hubfs/Excess%20pore%20pressures%20after%20construction%20on%20undrained%20subsoil.png?width=780&name=Excess%20pore%20pressures%20after%20construction%20on%20undrained%20subsoil.png" ],
  "mainEntityOfPage" : {
    "@id" : "https://virtuos4u.com/blog/slope-stability-of-embankments-on-clay-plaxis",
    "@type" : "WebPage"
  },
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "url" : "https://virtuos4u.com/hubfs/virtuos4u_2_348%2020%20cm-1.png"
    },
    "name" : "Virtuos4U GmbH"
  }
}
```